Clean, Low-Cost Power and Sustainable Revenue for Knox County

Frasier Solar

Frasier Solar is a proposed 120 MW solar photovoltaic (“PV”) facility located in Clinton and Miller Townships in Knox County, OH.

The project is being developed by Open Road Renewables in partnership with farmers and landowners. Open Road is a renewable energy company focused on developing utility-scale clean energy projects in the United States. Open Road’s highly experienced team is on a mission to make the promise of clean energy and economic security a reality for communities across the country. We are committed to being an excellent local partner by supporting the community's needs, soliciting feedback, and making ourselves accessible to all of Knox County. 

Embed Block
Add an embed URL or code. Learn more

Local Benefits

Installing solar arrays on private property in Knox County will generate significant economic and ecological benefits for the entire community.  

Solar allows landowners and farmers to diversify their income, plan for retirement, or even put their kids through college, while preserving the land for their future generations. Outside of the benefits to the participating landowners, Frasier Solar communities benefit from the increased tax revenue generated by solar projects. Revenue from Frasier Solar will support Knox County, the Mt. Vernon City School District, critical service-providing agencies like emergency services, career centers, and other local tax jurisdictions.

Ohio counties have the option to receive revenue from utility-scale solar facilities through the Payment in Lieu of Taxes (PILOT) program, which can generate millions of dollars in new revenue for the host county and local taxing jurisdictions. Aside from a stable and predictable revenue stream, the PILOT has many benefits counties and local taxing jurisdictions, including:

  • School districts are “held harmless” under state education funding formulas, meaning that the increase in revenue from the solar project will not adversely effect state funding. The solar revenue is additive to their budget.

  • 80% in-state labor requirement during construction

  • Road use agreement ensuring roads are kept in good shape during construction and returned to their previous condition

  • Support for local college or vocational school

  • Training and equipment for first responders

Minimal Impact

Modern solar farms consist of thousands of solar modules mounted on racks that are attached to steel posts driven directly into the soil without the use of poured concrete. Existing drainage is maintained and the entire site is planted with hardy, native grasses, even under the solar modules. Frasier Solar will be required to decommission the facility and return the site to its original, agricultural condition upon completion of the project (in 40 years), as well as to post a bond to cover those obligations.

Experience

The Open Road Renewables team developed the 200 MW Hillcrest Solar Project in Brown County, Ohio as well as the 150 MW Willowbrook Solar Project in Highland County, Ohio and is actively developing best-in-class solar projects across the state.

Project Overview

Frasier Solar will be located south of Mount Vernon in Clinton and Miller Townships in Knox County. The Project will have a nameplate capacity (ability to generate) of 120 MW and will occupy up to 840 acres of agricultural land planted with native grasses and other vegetation and and can be returned to farming after 40 years. The grass inside the facility will be maintained by grazing sheep. Additional information about the project is available here.

 
 

Site Plan Overview

Project capacity: 120 MW

Total fenced area: 840 acres (max)

Inverter Type: Central

Racking type: Single-Axis Tracker

Foundation: Driven Pilings

Maximum height: 12 feet

Minimum Setbacks from Non-Participating Residences

Solar Panels: 300 feet

Inverters: 500 feet

Minimum Setbacks from Public Roads

Solar Panels: 50 - 150 feet

Minimum Setbacks from Property Lines

Solar Panels: 50 feet (or higher depending on adjoining use)

Minimum Setbacks from Streams and Wetlands

Fence: 25 feet